Eight Weeks to Success
Our installation team is capable of having a system up and running in as little as eight weeks. This is made possible through proprietary advances in both the methodologies of the installation team and in the software itself.
Zero PLC Programming? It’s not just a dream
The ZPI system can be installed without any PLC programming. Using our advanced SmartLogics Expression system, complex logical algorithms can be created from base signals within your PLC, negating the need for excessive and often redundant PLC programming.
Connectivity
Client connectivity varies from site to site, but typically the ZPI system is installed on an existing PLC network. Where no PLC network exists, we will work with the client to help create the required connectivity, something that has far reaching benefits beyond data collection.
